PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started installing shear wall panels at Elev. 4-Stair -2 (3rd Floor) Facing South-West (800x600).jpg Started underground storm piping between column lines G-G.1 Facing North (800x600).jpg Welding extension beams at Derrick -2 (2nd Floor) Facing West (800x600).jpg After pouring concrete at underground service pipes Facing South (800x600).jpg Backfilling inside Stair -5 pit Facing North (800x600).jpg Building rebar mats for Elev. 1,2,3 (3rd Floor) Facing East (800x600).jpg Finished installing shear wall panels at Elev. 4-Stair -2 (3rd Floor) Facing South-West (800x600).jpg Installed electrical panels on the 2nd floor Facing North (800x600).jpg View of the steel arch from the 2nd floor Facing East (800x600).jpg
Previous pageNext page Backfilling inside Stair -5 pit Facing North (800x600)
Backfilling inside Stair -5 pit Facing North (800x600)